The Definitive Guide to factory acceptance test sample
For example, Allow’s declare that the main electronic output that We now have here is connected to a motor by using a contactor. The PLC application logic, suggests when the extent switch one and amount switch 2 are each Energetic, we need to hold the motor connected to this output turned on.Testing can include several different inspection points